Engineering, procurement and construction firms that lose most to ground surprises — and gain most from knowing the subsurface before they break it.

The ground is the biggest line of risk

For EPC firms and civil engineers, unexpected ground conditions are the classic source of overruns and disputes — voids, soft layers, buried utilities, rock where soil was assumed. The fix is simple in principle: know the ground before committing the design and the crews.

AORVIS surveys tunnel routes, foundation sites and corridors non-invasively, delivering a 3D ground model engineers can design against and monitor through construction and operation.

A fixed-price contract is only as fixed as the ground assumptions underneath it.

Where we help

  • Tunnel, rail and highway route surveys
  • Foundation and site investigation
  • Utility detection and clash avoidance
  • Construction and settlement monitoring